Adam and I are ready to stakeout for the power pole and guide wires.
Justin is explaining the process of staking.
I am detecting power . These lines are live! BEWARE!
Check out the heavy brush behind Adam, Travis and myself. This right-a-way needs to be cleared to prevent future power outages.



Adding a transformer to the power pole. 35 plus feet in the air!!!!
Safety Issues – #1 Priority
1960’s Breaker System

Breaker System w/Computerized Data Outputs

NC Electric Co-op Headquarters in Raleigh

A jet engine at the Hamlet Peaking Plant. The exhaust from this engine is turned into electricity.


The Hamlet Peaking Plant
Catawba Nuclear Plant